A national format on a column grid that did not match the standard bay. The standard survived; the layout moved.

  • 2200
    Sqft
  • 14
    Standard bays
  • 06
    Columns in plan
  • 00
    Bay variations
  • 00
    Days late

01 · The shell we were given

The column grid was 300mm out of step with the standard bay, in both directions.

The national format is drawn around a fixed bay module with fixed fixture lengths. On this floorplate the structural grid landed 300mm off that module, and cutting bays to suit would have produced fourteen bespoke pieces and a store that no longer matched the rollout.

We treated the bay as fixed and the layout as the variable: the run positions moved, the circulation loop was redrawn around the columns, and the columns were absorbed into full-height end panels rather than being clad as objects in the floor.

Van Heusen, bare shell at handover

Fig. 01 · Week 0, as handed over

02 · Programme achieved

The construction programme

Shell handover, survey
Demolition, making good
MEP first fix
Partitions, substrate
Ceiling grid, rafts
Flooring
Joinery delivery, install
MEP second fix
Lighting, focusing
Testing, commissioning
Snagging, handover
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Weeks · Ochre bars are on the critical path

03 · Trading

Van Heusen, trading
Van Heusen, interior detail 1
Van Heusen, interior detail 2

Every fixture on the floor is a standard rollout part. Nothing was cut to fit the building.

04 · Record

Client
ABFRL
Location
Chennai
Scope
Design and build, format rollout
Area
2,200 sqft
Programme
—
Completed
2025

Enquiry